Six minimum control measures are addressed in the Greater Elkhart County Stormwater partnership Rule 13 Stormwater Quality Management Plant (SWQMP):

  • Public Education and Outreach *
  • Public Participation and Involvement *
  • Illicit Discharge Detection and Elimination
  • Construction Site Storm Water Run-off Management *
  • Post Construction Storm Water Run-off Control
  • Good Housekeeping and Pollution Prevention

Items that are marked with an asterisk (*) are being implemented on a Partnership wide basis, with the Elkhart County Soil and Water Conservation District (SWCD) coordinating these efforts. Construction Enforcement and other measures that are not marked are being addressed separately according to each governmental jurisdiction.  For specific details contact:

Bristol           City of Elkhart           City of Goshen              Elkhart County